BOBBIE DALTON
101 Chapman Rd.
Wurtland, KY 41144
*Home: 606-494-2107*
Mobile: 606-571-8391
bobedalton@yahoo.com
LOOKING FOR A CHALLENGING POSITION IN THE WIRELESS FIELD
PROFESSIONAL EXPERIENCE:
Mercury Z 7/2013 –
10/2013
Central Office Field Supervisor; Southern WV
Completion of final interview process for possible candidates to be
deployed in the field, in the WV market, place and supervise techs according
to skill set in the areas they were needed, create spreadsheets and maps with
site info, follow up with techs to resolve any unanswered questions or
issues, and to keep techs up to date with what’s conspiring within the
market.
Glotel
04/2013 – 05/2013
Sr. Integration Engineer
Boston, MA
Complete site surveys for MCPA Harvest to reconfigure Ericsson 3106
outdoor and 3206 outdoor BTS with Nokia GSM and bypass MCPA for AT&T 4G
LTE upgrade and instruct new hires on the same, in the Boston, MA market
Philtek Solutions
02/18/2013 – 03/18/2013
Part time Construction Manager/Lead Integrator/Part time Tower Crew
Foreman and baby sitter; Milwaukee, WI, Chicago, IL
Build, troubleshoot, and commission for NSN/T-Mobile Multi Radio BTS
2G/AWS, 3G/UMTS to make way for 4G/LTE and D-Com of Nortel S8000 and S12000
Maintain CM duties, pictures, closeout packages, site walks, materials, crew,
etc… along with Integration of sites, Instruct new CM’s how closeout info
needed to be populated, pictures that are needed and order in which they need
to be taken due to safety issues, along with info needed on each pic, the
correct way to collect data needed for 911 survey to make sure the LMU stayed
operational. Worked hand in hand with T-Mobile’s Tiger Team to learn how to
properly troubleshoot issues with Fibers, Cards, LMU, Bad Ports, etc… Scope
fiber and capture file, test fiber with fiber test set and calibrate tester.
Insure tower crews had proper documentation and followed all safety
rules and precautions.
Site Master
12/02/2012 – 01/06/2013
Commissioner/Integrator
NSN/T-Mobile Modernization
project Atlanta,
GA
NSN Certification of completion for I/C (Integration-Commissioning)
Course for NSN/T-Mobile Multi Radio BTS 2G/3G, in Atlanta, GA. Ground-up
installs of NSN 2-G, 3-G, Radio, Modules, FOCA, and COVP to replace existing
Ericsson 2106-2206 BTS, run fiber from modules in FOCA to COVP on the ground,
to the COVP on the tower, install and terminate alarm panel. Install circuit breaker,
power, etc… in Purcell cabinet, preform test calls on 2G for 911 and 3G for
voice and data, take closeout pictures, troubleshoot fiber jumpers, assist
tower crew with ground work and issues at the COVP “up top” and
Integrate/Commission sites to prep for 4-G-LTE equipment to be installed in
the future, assure Tower Crew knew what was needed from them “up top” as well
as on the ground, and made sure all safety precautions were being followed;
Smart Source
11/28/2012 – 12/02/2012
POS Installer
Ashland, KY
Install all POS equipment for fast food restaurants along with assist
of commissioning of new equipment
Registers, monitors, computers, run CAT-5, make connectors, terminate,
etc…
Frontier
07/1/10 – 1/10/11
NOC Technician/Central Office Tech
Huntington, WV
Utilizing Software such as, REACT, Varinet / V-Repair, MetaSolve
(M-6), to make trouble tickets for circuits for AT&T, Sprint, Alltel,
Nextel, T-Mobile, Coal Mines, Commercial Companies, and GPS. Remotely…Track
Field Techs with GPS software, Loop CSU, Test Circuits for Major Companies,
also test remotely with in state and out of state Techs to resolve site
issues and escalate trouble tickets as needed to insure issues are resolved
as quickly and efficiently as possible.
T-Mobile / Apex
6/11/08 to 6/05/09
Field
Tech.
Chicago, Il
UMTS T-1 integration with Node-B, from Nortel S12000 BTS for 3-G
upgrade for the NODE B. “Build” S12000 Nortel BTS in various configurations
2-2-2, 3-3-3, 6-5-3, 8-6-6, 4-3-3, etc…Train New Hires on same. Troubleshoot
T-1/CSU issues, Head to head with switch on T-Berd; install cold weather kits
(Ceats Kits). Cabinet compressions going from up to 3 S12000’s BTS cabinets,
down to as few as 1, Supervise Tower Crews for TMA Installs. TMA installs
with PDU to increase DC output along with troubleshooting issues with TMA not
being seen by PDU or by the Anritsu, issues with “extra radios” in a sector
not being connected correctly, Sector adds for a forth sector, New Site
builds, decommission s12000 Nortel “Live and ON LINE” and replace with s8000
and re-commission the site with the Switch or NOC and troubleshoot any issues
that come along with this process such as TEI positions not loaded correctly,
bad radios, etc…
ConnectLink
3/08
Tower Crew
Foreman
Chesapeake, OH
Wireless Internet; Tower Crew Foreman, Instruct tower hands on safety,
installation of radio equipment and antennas on towers, “Ping” nearby towers,
climb up to 650' and install wireless RF antennas, switch, and components for
service to the customer from the provider. Custom equipment modification and
fabrication to meet customers’ needs and adhere to OSHA standards.
True Position / S-Com for,
1/08 – 3/08
Sr.
Auditor/Supervisor
NY, IN
NY/Indianapolis Restoration Project E-911 LMU Troubleshooting
Post install site audits, troubleshooting for E-911 LMU ,
Decom "harvest" WLS , KDI, Program Kentrox and
Flexmaster . Surveys , Beacon issues , Spect. issues , Holdovers ,
Gains , along with other maint. that goes along with LMU installs or HOT CUTS
Maintenance on “DAC” sites (Down After Commissioning)RF issues, Radio
Issues, GPS Ant. Failure, LMU failure, connectors, etc…for Ericsson, and
Nortel BTS.
Nortel
8/07
Tester/Trainer
Chicago, Ill
Instruct installers to Install OTR’s in OM5200 and OME6500, CPL
shelves, Run Fibers etc…
Clear Wire
5/07
Lead Field Engineer
Dayton, OH
Mount Program, Power-up and up-grade Adtran, Foundry, Valere,
Omnitronix SL81, BTS, Tasman, Digi Modem along with programming and
commissioning of Redline, Orthogon, and Dragon Wave Microwave Installation
and set-up.
S.Com
08/06 TO 12/06
AUDITOR
San Francisco, CA
Pre install site audits on Nortel and Ericsson BTS, Post install site
audits, troubleshooting for E-911 LMU,
Decom “harvest” WLS, KDI, and Program Kentrox and Flex master from
Ericsson, Nortel BTS Surveys, Beacon issues, Spectral Issues, Holdovers,
Gains, along with other maintenance that goes along with LMU installs or HOT
CUTS.
Coordinate installation efforts of other installation teams at various
locations concurrently
S.Com
04/06 TO 8/06
Lead Technician
San
Francisco, CA
Implemented, programmed and commissioned True Position (e911 LMU)
Wireless Location Unit into GSM Ericsson 2102 and 2106 BTS cabinets and Nokia
BTS 850/1900 Ultra-Sites deployed at Cingular Wireless/AT&T/T-Mobile
Wireless Run RF, Sweep with Anritsu, Troubleshoot, Loopback test, Surveys,
Collected GPS latitude and longitude data from handheld for site survey. Made
RF, coax, RJ45, N-Type connectors and T1 (CAT 5) line plus experience with
microwave systems and Andrews connectors
Glotel
02/06 TO 04/06
LEAD
TECHNICIAN
Kansas City
LMU INSTALL, TROUBLESHOOT, MAINTENANCE, DRIVE TEST, T1 ISSUES WITH THE
SWITCH, & COMMISSION THE EQUIPMENT
WILKINS
09/05 TO
11/05
Field Technician
New Orleans, LA
LMU INSTALL, TROUBLESHOOT, MAINTENANCE, & COMMISSION of Ericsson
2106-2206 BTS cabinets. BATON ROUGE & NEW ORLEANS POST KATRINA
I.T.C.
03/05 TO 09/05
INSTALLATION TECHNICIAN-LEVEL
IV
Kansas City
WORKED PRIMARILY WITH SIEMENS HCBSC & HCTRAU
COMPLETE INSTALL RUNNING CABLE TO DSX TERMANATE RUN & TERMINATE
POWER BASE & EXTENSION RACKS IN CELL SITES
T-MOBILE
10/04 TO 03/05
Lead
Tech
Washington, D.C.
INSTALL & COMMISION TRUE POSITION LMU
PERFORM SITE SURVEYS FOR T-MOBILE ERICSSON 2106-2206
TEST T-1 & POWER LINES USING T-BERD AND WATT METERS
MEASURE AND WIRE SITES BASED ON TECHNICAL SPECS
TEST AND TROUBLESHOOT ALL EQUIPMENT WITH REMOTE SWITCH TECH
BUTLER
08/04 TO 10/04
LEVEL IV
TECHNICIAN
DFW, Texas
INSTALL FUJITSU 4500 FOR BROADBAND RUN &TERMANATE POWER & DS3
ALSO QUALITY STANDARDS CLASS FOR FUJITSU
TAD
10/98 TO 08/02
Sr. Field
Supervisor
North East Region
Install Nortel OC 192, OC 48, OC 12, OC 3, Optera & Transport
Bandwidth Manager, Fiber Optic Cross Connect Panels, Install Lightwave
Distribution Frames Alcatel 600 S, run & terminate power, BNC'S, timing
and ground for MCI (Many Confused Individuals) WorldCom. Extensive experience
in emergency power systems and batteries. Training in AC/DC power systems,
Manage 30+ Techs on MOP, SOP, etc… on ground up site builds. Fiber and BNC
Cert.
EDUCATION:
SHAWNEE STATE UNIVERSITY: 2 years, Education Major
Special Training/Certifications:
BASIC TELECOMMUNICATIONS COURSE “METHOD OF PROCEDURES” O.S.H.A. (1993)
GUDELINESFOR WORK PLACE SAFETY, OWENSBORO, KY (1993)
FUJITSU STANDARDS AND INSTALLATIONS CLASS FOR TRANSMISSION EQUIPMENT,
B.N.C. COAXIALCONNECTION AND INSTALLATION COURSE; WASHINGTON, DC. (1996)
BELL ATLANTIC “STANDARDS, PROCEDURES, AND SAFETY; BALTIMORE, MD.(1998)
MCI WORLDCOM COAXIAL CONNECTION AND INSTALLATION COURSE; BOSTON,
MASS.(1998)
TAD TELECOM “BASIC INSTRUCTIONALCOURSEFOR NEW LIGHTWAVE INSTALLERS”
NEWPORT, RI.(1999)
MCI WORLDCOM “DC POWER STANDARDS AND PROCEDURES” WILMINGTON, DE.(1999)
MCI WORLDCOM “LIGHTWAVE FIBER SPLICING COURSE “HARTFORD, CT. (2000)
MCI WORLDCOM “DC POWER STANDARDS AND PROCEDURES” (PHASE II) CLEVELAND,
OH.(2001)
True Position LMU Install training for single band 850, Washington,
DC.(2002)
T-Mobile LMU Installation and Maint. 850 New
Orleans, LA.(2005)
True Position LMU Installation, Maintenance, Troubleshooting,
Harvesting WLS, and KDI, San Francisco, CA (2006)
Clear Wire Install and provisioning training for Wireless Broadband
Network Dayton, Ohio
NSN TMO MR-FLX-002-FLXINS_CI-USA
Flexi Multi Radio BTS (2G & 3G) Commissioning & Integration
References Upon Request